hydraulic system for a multipurpose test rig

This multipurpose test rig has been engineered in order to develop hydraulic components. Every test station (5 in total) can individually run autonomous test cycles. The hydraulic system is suitable for a maximum pressure of 420 bar at a maximum power of 450 kW and can regenerate hydraulic energy into electrical energy for environmental friendly […]

Drive and control 5.200t Jacking System

The Hydac group has designed and delivered the hydraulic drive and control system for the operation of a 5.200t Jacking System. The 5.200 ton jacking system is used for lifting major construction structures by using multiple lifting points. Each jacking tower consists of four bases or 6 bases, each with a jacking cylinder, that are […]

Drive and control system active heave compensation system

For a West European dredging and offshore contractor we have supplied the drive and control system of an active heave compensation system. The system is used for the LARS system. Besides the HPU, piping and control system we also supplied the hydraulic winch.

electrification cable tensioner

A tensioner must maintain very stable and predictable line tension to protect the submarine cables. We replaced the hydraulic drive for an electric drive. For this application the electric drive was a better solution to achieve a better synchronization between tensioner racks. We upgraded the hydraulic circuit of the clamping device. This system remains hydraulically […]

Motion compensated gangways

For Safeway Netherlands we have supplied several drive and control systems for their motion compensated gangways named Osprey and Seagull. We supply the containerized HPU, hydraulic cylinders, lifting and slewing hydaulic motors and hydraulic piping.

Barge Mooring System

Due to the Jones Act in US, barges are used to transport monopiles from port to the offshore wind farm. Special mooring systems with heave compensation are used to arrange a safe lifting of monopiles from the barge to the OFW Vessel. Typical scope of supply: – 320kW HPU – Control cabinet for operation – […]

Barge Mooring System

Due to the Jones Act in US, barges are used to transport monopiles from port to the offshore wind farm. Special mooring systems with heave compensation are used to arrange a safe lifting of monopiles from the barge to the OFW Vessel. Typical scope of supply: – 320kW HPU – Control cabinet for operation – […]

Monopile Upending & Seafastening

For this application we have supplied a 440kW HPU, piping and hydraulic cylinders (41 pcs). Hycom was responsible for the complete hydraulic and electric control system.

Jacket lifting and monopile handling tools

We have supplied for several jacket and monopile lifting tools drive and control systems. Typical scope is a small HPU, cylinders, accumulator back up system, control system with remote control and wireless camera.

XXL Monopile Gripper and Upending & Seafastening

In 2025 we commissioned the drive and control system of these systems for one of the biggest OFW vessels. For the gripper we supplied: – 430 kW HPU – 16 pcs NMS winches – Control system – Rotation units – 38 pcs hydraulic cylinders – Piping and cabling. For the upending and seafastening we supplied: […]
1 2
Hycom
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.